GCPBA River News, May 30, 2024 – Still No Reply

Our October 30, 2023 letter to the Secretary of the Interior has still not received a reply – even after an appeal by a Congressional representative  that the Secretary respond.  The letter recommended that the USBR convene a panel of experts to study the necessary modifications to Glen Canyon Dam given the drought conditions of the Colorado River Basin